Airport Plus | Cheltenham

Airport, seaport and long distance transfers specialist operating to and from the Gloucestershire and Cotswold areas.
Cheltenham, Gloucestershire
Phone: 01242 808090

• Cheltenham To Heathrow Airport £145 •

Distance: 96.3 Miles

Estimated journet time: 2 hours

Price From £145 for up to 4 passengers Click Here To Book Online or Call 01242 808090 int: +44(0)1242808090


View Larger Map

About Heathrow Airport LHR

London Heathrow Airport or Heathrow LHR, is a major international airport serving London. Located in the London Borough of Hillingdon, in West London, Heathrow is the busiest airport in the United Kingdom and the third busiest airport in the world (as of 2012) in terms of total passenger traffic, handling more international passengers than any other airport around the globe. It is also the busiest airport in the EU by passenger traffic and the third busiest in Europe given the number of traffic movements, with a figure surpassed only by Paris-Charles de Gaulle Airport and Frankfurt Airport. Heathrow is London's main airport, having replaced RAF Northolt, and together with Gatwick, Southend, Stansted, Luton and London City Airport, London is the busiest city airport system in the world by passenger traffic (with 133,666,888 passengers travelling through the six airports); and second only to New York City in terms of traffic movements. The airport sustains 76,600 jobs directly and around 116,000 indirectly in the immediate area, and this, together with the large number of global corporations with offices close to the airport, makes Heathrow a modern aerotropolis which contributes an estimated 2.7% to London's total GVA.

Heathrow lies 12 nautical miles (22 km; 14 mi) west of Central London, and has two parallel east–west runways along with four operational terminals on a site that covers 12.14 square kilometres (4.69 sq mi). Terminal 5 was officially dedicated by Queen Elizabeth II on 14 March 2008 and opened to passengers on 27 March 2008. Construction of a new Terminal 2 complex to replace the old terminal building and adjacent Queen's Building began in 2009 with the first phase expected to open in 2014. Terminals 3 and 4 underwent major refurbishments between 2007–2009. In November 2007, a consultation process began for the building of a new third runway and a sixth terminal, which was controversially approved on 15 January 2009 by UK Government ministers. The project was subsequently cancelled on 12 May 2010 by the Cameron Government

The airport holds a Civil Aviation Authority Public Use Aerodrome Licence (Number P527), which allows flights for public transportation of passengers or for flying instruction.

Click Here To Read our Terms And Conditions